Belading van wagons uit voorraadbunkerLoading of wagons from storage bunkers. At Sea-bulk (Dunkirk), ore trains are loaded from an 800 ton storage bunker; the ore travels 2km on conveyor belts.
The weighing system on the storage bunker prevents that a surplus of ore has to be brought back by trucks. (enormously cost saving).
The storage bunker leans on 6 HE-profiles that are equipped with Plug-in straincells.